FROM SCHEDULE TO ESTIMATE

Build your estimate.

Select your SOR. Choose items. Enter quantities.

01

Work details

Draft saved on this device
02 / SOR CATALOGUE

Find an item

Loading…

Enter an exact SOR number or search by words.

0 selected
03 / YOUR ESTIMATE

Selected items 0

Removed items can be restored while this estimate stays open.
ITEM / DESCRIPTIONQUANTITYAMOUNT
▤

Your estimate starts here

Add an item from the catalogue.
Its original rate and description come with it.

Estimate total₹0.00

GST is already included in the selected SOR rates.

G Type reference template · Original SOR wording

Estimate preview
My estimates

Saved in this browser on this device. Download a backup to keep a separate copy or transfer your estimates.

Saved versions

Open a saved version as a separate copy. The current estimate stays saved.

Estimate sections

Choose the sections for this work and edit their headings. SOR descriptions, units and rates stay locked. Only sections with items appear in Excel/PDF.

Calculate quantity from measurements

Use dimensions consistent with the SOR unit: metres for Metre, square metres and cubic metres. No automatic unit conversion is applied.

Details stay saved with this estimate. Only the final quantity appears in the original Excel/PDF format. Editing quantity manually clears the saved measurements for that item.

Electrical design assistant

SOR-only suggestions · fixed 30 m per segment · circuit drop limit 2% · sub-main drop limit 1%

Fixed one-way design distance: 30 metres for each circuit and for the sub-main. Calculations apply to this assumed route; actual longer routes need a separate check.

Add SOR items room by room. Items with the same circuit group in a room share a circuit. Use separate groups for dedicated equipment. Power factor is fixed at 0.9 for every item. Input watts means electrical input, not AC cooling capacity or motor shaft output.

This applies consolidated quantities of the listed room SOR items to the chosen section. Existing quantities of those items are replaced; unrelated SOR items stay unchanged. Wiring suggestions are added separately after review.

Calculation method & remaining checks

Connected load = quantity × electrical input watts. Demand factor is 100%; no automatic diversity or spare margin. PF is fixed at 0.9 as a project assumption. Single-phase I = W / (V × PF); three-phase I = W / (√3 × 415 × PF). Main current uses the highest phase current with real/reactive load summed per phase. A three-phase row assumes a balanced load. Three-phase sub-main screening includes the calculated fundamental neutral current, using (highest phase current + neutral current) × length × (R+X) relative to phase voltage. Harmonic neutral current is not included.

Wire shortlist is a voltage-drop screen, not a current-capacity selection. Copper screening uses R = 0.0225 / area Ω/m, X = 0.00008 Ω/m and ΔV ≤ k × I × 30 × (R+X), k = 2 or √3. Separate screening budgets: sub-main 1%, circuit 2%. Combined path is shown. These are planning assumptions, not a declaration of code compliance. Earth and neutral arrangements, cable ampacity/derating, starting current, trip curve, fault level, disconnection and selectivity remain to be checked. A SOR rate covering an ampere range does not specify an exact purchased rating.

Voltage-drop method · Protection selection checks